Moving It Forward

My method of managing scraps is that when a bin gets full it's time to design a quilt around what's in the bin. I organize my scraps in bins by color, for scraps between the size of a fat quarter and charm square. Those smaller than a charm square go in a bits bin. I also have a bins with 1 1/2" strips, 2 1/2" strips and random widths. Well, my random widths bin can barely be contained by it's lid. So it's time to design a quilt using these strips. 
I by sewing those strips into stratas and then cutting them into little sets of coins. I have a couple of planes for these coin sets. But so far this is all the progress I have with this new project.
I'd love to see what you are moving forward. Are you tackling an unruly scrap bin? Is a new brain child forming in your head? Or are you making progress on an existing project. 


Moving It Forward



Grab my botton, fixed thanks to Sarah and link up and share. 





Read More
Previous
Next Post »